Wednesday, February 25, 2015

Kid Bathroom - Salle de bain des enfants

The contractor is working on that project at the same time than the master suite. The upstairs bathroom (because there is one in the basement... we'll come to that one later) was from another time, a bit small for 3 kids, definitely needing some extra closet space and yes really .... Green!!! 
As we were working on the plumbing for the master bath, we've decided to work on that remodeling at the same time, to save some plumbing cost... a costly work which needs to be done (as we update the pipe to match the 21st century code) and won't be noticed so much so happy to save money on that part!
We are turning the tub into a walk in shower, adding a second sink and moving the wall to be able to "move" in the space!


Le chef de chantier travaille sur ce projet en parallèle de la suite parentale. La salle de bain du premier (car il y en a une dans le sous sol... on y reviendra plus tard) était d'un autre temps, un peu petite pour 3 enfants, avait définitivement besoin de rangements supplémentaires et surtout était très... Verte!!!!

Comme nous travaillons sur la plomberie pour la salle de bain des parents, nous avons décidé de refaire cette salle de bain en meme temps pour économiser sur les frais... un travail cher, qui doit etre fait (car au passage on met les tuyauteries aux normes du 21ème siècle) mais ne se verra pas donc nous sommes contents d'économiser la dessus!
Nous transformons la baignoire en douche, ajoutons une deuxième vasque et on bouge un mur pour pouvoir "bouger" plus facilement dans la pièce!